01The challenge
The three grandstands had different lengths, returns, stair positions and structural interfaces. The banner framework needed to create a consistent fixing line across large elevations while working around the existing grandstand construction.
02The solution
Tube-and-fitting vertical supports were combined with horizontal catenary wires. The tensioned wire system gave the banner contractor continuous fixing lines, with the mesh sections secured using bungee cord.
03The delivery
The frameworks were erected, tensioned and prepared across Stirling A, Stirling B and Woodcote A ahead of the Grand Prix, allowing the completed advertising wraps to transform the rear and return elevations.
Event structures
Working to a fixed opening date?