Yorkshire based · Nationwide delivery0113 534 7006hello@veritas-scaffold-group.co.uk
VERITASSCAFFOLD GROUP
Menu
Request a quote
Full-height HAKI temporary staircase providing site access

HAKI staircases

High-capacity access between every working level.

Robust temporary stair access for busy construction sites, multi-level projects, public-facing environments and emergency access requirements.

Discuss your project
VSG / SERVICE

Built around the work

A well-positioned staircase improves more than access—it supports movement, productivity and emergency planning across the whole site.

Veritas plans HAKI staircases around landing levels, expected users, pedestrian routes, scaffold interfaces and the space available at ground level. Stairs can be delivered as a standalone access structure or integrated with system and tube-and-fitting scaffold packages.

What we deliver

Clear access designed around real site movement.

Scope, interfaces and programme are reviewed before the access arrangement is finalised.

01

Construction stairs

Reliable access between multiple work levels for operatives and site teams.

02

Public access

Temporary routes for controlled public-facing and high-footfall environments.

03

Emergency routes

Stair arrangements considered around the wider site access and egress plan.

04

Integrated structures

Landings and tie-ins coordinated with façade scaffold, platforms and temporary works.

View through the landings of a multi-level HAKI staircase

Multi-level access

A route people can use safely and efficiently.

Landing positions, traffic flow and scaffold interfaces are established early so the temporary staircase serves the programme rather than competing with it.

Multi-storey projectsIndustrial sitesMajor constructionPublic eventsEmergency accessTemporary workplaces

From brief to dismantle

One controlled delivery process.

  1. 01

    Review

    Understand the structure, workface, users, constraints and programme.

  2. 02

    Plan

    Confirm the system, design needs, logistics, sequence and project controls.

  3. 03

    Deliver

    Coordinate transport, erection, handover and any live adaptations.

  4. 04

    Close

    Manage inspections, communication and dismantle around the completed work.

Project coverage

Yorkshire based.
Nationwide capability.

Our core teams work throughout Yorkshire and the North, with major, specialist, contract and event delivery across Great Britain.

LeedsYorkHarrogateNationwide projects

Common questions

Planning haki staircases.

Can a HAKI staircase connect to existing scaffold?+

Yes, where the arrangement is suitable. The landing levels, tie-in details, loading and access routes should be coordinated before erection.

Are HAKI stairs only for construction sites?+

No. They can also serve event, industrial and public-facing environments where robust temporary movement between levels is required.

Can you provide the staircase as part of a full scaffold package?+

Yes. Veritas can integrate stair access with system scaffolding, tube and fitting, temporary roofs and other project access requirements.

Start the conversation

Send us the site, scope and required dates.

We will review the work and help identify the most practical access approach.

Request a quote